Calibration
Calibration certificate: what it must contain and what auditors check
A calibration certificate is the laboratory's record of how far your instrument read from a known reference, how sure the lab is of that result, and how the reference traces back to national standards. A complete one names the lab and the instrument, gives as-found and as-left results with their measurement uncertainty, states the method, conditions and traceability, and is signed by an authorised person. Auditors check that it belongs to the gauge on the floor, that a pass or fail was judged against your tolerance, and that you acted on any result that was out.
What a calibration certificate must contain
Accredited calibration labs work to ISO/IEC 17025. Its reporting clause sets out what a certificate has to carry, and NABL assesses Indian labs against it. You do not need to read the standard to check a certificate. You need to know which fields should be there and why each one matters to you.
Think of it in three parts. The first tells you whose certificate it is. The second gives the result. The third tells you how much to trust that result.
Who and what
- The laboratory's name and address, and where the work was done if it was on your site.
- A unique certificate number, shown on every page, with a clear end to the report.
- Your company as the customer.
- The instrument: description, make, model, serial number, your tag number and its condition on receipt.
- The date of calibration and the date of issue.
The result
- The method or procedure used.
- The results at each test point, with units.
- Results before and after adjustment or repair, when the lab adjusted the instrument. These are the as-found and as-left readings.
- The environmental conditions that affect the result, such as temperature for a dimensional or thermal calibration.
How much to trust it
- The measurement uncertainty for each result, in the same unit or as a relative value.
- A statement of how the result is metrologically traceable, usually naming the reference standards and their own certificates.
- If the lab says pass or fail, the specification it judged against and the decision rule it used.
- The name and signature of the person who authorised the certificate.
One thing a certificate should usually not contain is a due date chosen by the lab. Under ISO/IEC 17025, a lab only recommends a recalibration interval when you have agreed to it. Your interval is your decision. Our post on instrument calibration intervals covers how to set it.
As found, as left and uncertainty: reading the numbers
As found is how the instrument read when it reached the lab. It tells you whether the gauge was in tolerance while your people were using it. This is the number that matters for product already made.
As left is how it read after the lab adjusted it. It tells you whether the gauge is fit to go back into use. A certificate that shows only as-left results hides the question an auditor cares about most: was it wrong last month?
Uncertainty is the lab's doubt about its own reading. ILAC policy expects an accredited calibration certificate to state it. A result of plus 0.015 mm with an uncertainty of 0.008 mm means the true error could be anywhere from about plus 0.007 to plus 0.023 mm, at the confidence level stated, often about 95 percent.
The lab does not know your tolerance unless you tell it. So compare the result and its uncertainty with the tolerance you actually use on the floor, not the maker's catalogue figure. Many plants also check that the uncertainty is small compared with the tolerance. A ratio of about 4 to 1 is a common rule of thumb. If the lab's uncertainty is half your tolerance, the certificate cannot tell you much.
ILAC G8 explains decision rules. With simple acceptance, a reading inside the limit passes even if its uncertainty bar crosses the line. With a guard band, the lab pulls the acceptance limit in by some or all of the uncertainty, so a reading like B fails or is reported as not proven. Neither is wrong. What matters is that the rule is stated on the certificate and is one you agreed to before the work was done.
A review checklist to copy
Run this the day a certificate comes back, before the instrument returns to the floor. One line each. If any answer is no, the instrument stays on hold.
| Check | What good looks like | If not |
|---|---|---|
| Identity | Serial and tag on the certificate match the instrument in your hand | Send back to the lab for a corrected certificate |
| Lab scope | The lab is accredited for this quantity and range, if your system requires it | Ask for the scope or use another lab |
| Test points | Points cover the range you actually use | Ask for the missing points next time; record the gap |
| As found | As-found results are shown and within your floor tolerance | Quarantine and start an impact review |
| As left | As-left results are within tolerance after any adjustment | Repair, recalibrate or retire |
| Uncertainty | Stated for each result and small against your tolerance | Question the lab, or tighten the review |
| Decision rule | Named on the certificate wherever a pass or fail is stated | Judge the result yourself against your rule |
| Traceability | Reference standards named with a traceability statement | Do not accept until stated |
| Signature and dates | Authorised signatory, calibration date and issue date present | Return for reissue |
| Filed | Certificate attached to this instrument's record, next due date set from your interval | File before release |
For what to copy from a NABL certificate into your register, see NABL calibration records.
Worked example: three certificates at a Pune auto component plant
Worked example (illustrative)
Take a machining plant in Pune supplying brackets and housings to a vehicle maker. On one Monday, the lab returns certificates for three instruments. Every number below is illustrative.
The quality engineer runs the checklist on each certificate before anything goes back to the line.
| Instrument | What the certificate shows | Finding | Action |
|---|---|---|---|
| Digital caliper, 0 to 150 mm, floor tolerance plus or minus 0.02 mm | Error at 100 mm: plus 0.015 mm, uncertainty 0.008 mm, simple acceptance, marked pass | Inside the limit, but the uncertainty bar reaches 0.023 mm | Plant rule uses a guard band, so the caliper is moved to non-critical checks and a better one is used for the 0.02 mm feature |
| Pressure gauge on a hydraulic press, tolerance plus or minus 1 percent of span | As found: 2.1 percent high. As left: 0.3 percent after adjustment | Was out while in use | Impact review of parts pressed since the last good calibration, then a shorter interval |
| Digital thermometer in the wash line | Results fine, but the serial number differs by one digit from the instrument | Certificate does not prove this thermometer | Held, returned to the lab for a corrected certificate |
What the example shows (illustrative). None of the three certificates said fail, and only one of the three instruments could go straight back into use. The caliper passed the lab's rule but not the plant's. The gauge passed after adjustment, yet the as-found reading opens a quality question about product already shipped. The thermometer was probably fine, but an auditor cannot accept probably. Ten minutes of review per certificate found all three.
What auditors check
Whether it is an ISO 9001, IATF 16949 or FSSC 22000 audit, the questions about a calibration certificate are much the same. The auditor picks an instrument on the floor and asks for its record. Then they check:
- That it is the same instrument. The tag on the gauge, the tag in your register and the serial on the certificate all match.
- That it was in date when it was used. They compare the calibration date with the dates on inspection records.
- That someone reviewed it. A certificate filed unread is a weak record. A signature or a review step shows the result was compared with your tolerance.
- What happened when it was out. For any as-found failure, they ask for the impact review and its outcome. IATF 16949 is explicit that out-of-specification readings as received must be recorded and their risk assessed.
- That the chain holds. The lab's traceability statement and, where required, its accreditation for that measurement. More on this in calibration traceability.
Common mistakes
- Filing without reading. The certificate goes into a folder and the sticker goes on the gauge. Nobody compares the result with the floor tolerance.
- Accepting as-left only. You lose the one number that tells you whether past product was measured with a good gauge.
- Trusting the word pass. The lab judged against its rule and maybe the maker's specification, not your tolerance. Check both.
- Ignoring uncertainty. A pass right at the limit with a large uncertainty is not the same as a pass in the middle of the band.
- Letting the lab set the due date. The certificate date starts your interval. Your history and risk decide its length.
- One PDF for ten instruments, filed once. Split it so each tag points to its own result, or the next auditor will hunt through pages to find one gauge.
Sources
- ILAC G8:09/2019 Guidelines on Decision Rules and Statements of Conformity (in the ILAC guidance series) (opens in a new tab), International Laboratory Accreditation Cooperation
- ILAC P14:09/2020 ILAC Policy for Measurement Uncertainty in Calibration (in the ILAC policy series) (opens in a new tab), International Laboratory Accreditation Cooperation
- JCGM publications, including the Guide to the Expression of Uncertainty in Measurement (GUM) (opens in a new tab), BIPM, Joint Committee for Guides in Metrology
- National Accreditation Board for Testing and Calibration Laboratories (opens in a new tab), NABL India
Frequently asked questions
What must a calibration certificate contain?
The lab and certificate number, your company, the instrument's identity, the calibration and issue dates, the method, results with units, as-found and as-left results when adjusted, the measurement uncertainty, a traceability statement, any decision rule used for pass or fail, and an authorised signature.
What is the difference between as found and as left?
As found is how the instrument read when it reached the lab. As left is how it read after any adjustment. As found tells you about product already measured; as left tells you whether the instrument can go back into use.
Does a calibration certificate show when the next calibration is due?
Not usually. Under ISO/IEC 17025, a lab only recommends a recalibration interval when the customer has agreed to it. You set the interval and the next due date from your own procedure.
What is a decision rule on a calibration certificate?
It is how the lab accounts for measurement uncertainty when it states pass or fail. With simple acceptance the reading alone decides. With a guard band the acceptance limit is pulled in by some of the uncertainty. ILAC G8 gives guidance on both.
What should I do if the as-found result is out of tolerance?
Quarantine the instrument, review what it measured since its last good calibration, decide on any product action under your quality procedure, then repair or replace it and consider a shorter interval.
Keep reading
Calibration management software
Schedules for machines and fitted instruments, with uploaded certificates and NABL details.
ReadInstrument calibration intervals
How often to calibrate, and how to adjust the interval from your results.
ReadNABL calibration records
What to keep from an Indian lab's certificate in your register.
Read