Maintenance strategy

Preventive vs predictive vs condition-based maintenance: which one, for which machine

Preventive maintenance services a machine on a fixed interval of time or usage. Condition-based maintenance waits until a measured reading, such as vibration or temperature, crosses a limit. Predictive maintenance goes one step further and trends those readings to forecast when the limit will be reached, so you can plan the job. Most plants need all three, chosen machine by machine.

By Jay Sampat, Co-founder, Codiot TechnologiesPublished Last reviewed 7 min read

Preventive, condition-based and predictive maintenance start work at different moments on the same wear curve A pencil sketch of a machine's condition over time. The condition line stays flat, then starts to fall at point P, the first sign you can detect, and keeps falling until point F, the failure. Marker 1 is a row of evenly spaced ticks on the time axis: preventive maintenance at a fixed interval, whatever the condition. Marker 2 is an orange circle where the condition line crosses a dashed warning limit: condition-based maintenance. Marker 3 is an orange dashed line drawn from the first few readings after P and extended ahead: predictive maintenance, which projects the trend to plan the job before the limit is reached. CONDITION TIME WARNING LIMIT P: FIRST SIGN F 123 1 Preventive: work on a fixed interval 2 Condition-based: work when a limit is crossed 3 Predictive: trend projected ahead to plan the job
The same wear curve, three different triggers. Preventive works to the calendar or the meter. Condition-based acts when a reading crosses a limit. Predictive reads the trend and books the job before that happens.

Three ways to decide when to maintain

Every maintenance strategy answers one question: when should this machine get attention? The three common answers differ only in what triggers the work.

Preventive maintenance uses a fixed interval. Change the compressor oil every 4,000 running hours. Grease the crane every week. Check the press hydraulics every month. The interval is set from the maker's manual and your own history. The job happens whether the part needed it or not.

Condition-based maintenance uses a measured reading. You set a warning limit on a bearing's vibration, a motor's winding temperature or a filter's pressure drop. When the reading crosses the limit, you raise the work. The machine tells you when, but only once the problem is already visible.

Predictive maintenance uses the trend of those same readings. Instead of waiting for the limit, you look at how fast the reading is moving and estimate when it will get there. That turns a warning into a date, so the bearing is ordered and the job sits in a planned stop.

There is a fourth option that people forget: run to failure. For a cheap, non-critical part with a spare on the shelf, letting it fail and replacing it can be the right choice. It should be a decision you write down, not an accident.

Why predictive maintenance is not always the better choice

Predictive maintenance sounds like the most advanced option, so plants often assume it is always better. It is not. It only works when three things are true.

First, the failure must give a warning you can measure. A bearing usually gets noisier and hotter before it seizes. In reliability-centred maintenance, the time between the first detectable sign and the actual failure is called the P-F interval. An electronic card or a fuse often gives no measurable warning at all, so there is nothing to trend.

Second, the warning time must be long enough to act. If a gearbox gives you three weeks of rising vibration, a weekly reading is enough. If a spindle goes from first sign to seizure in a day, a weekly round will miss it.

Third, the readings must come often and reliably. A trend drawn through four readings taken by different people with different meters is a guess. Readings from a sensor every few minutes, or a disciplined round on the same point with the same instrument, give you a trend you can trust.

If any of the three is missing, a well set preventive interval is usually cheaper and more dependable.

Four questions to pick the strategy for each machine

Four questions, asked in order, pick the maintenance strategy for a machine Four questions tick off in turn. Does a failure matter? If not, run to failure. Is there a warning sign you can measure? If yes, condition-based. Do readings arrive often enough to trend? If yes, add predictive. Does wear follow hours, cycles or time? If yes, preventive by time or usage. Does a failure matter?NO: RUN TO FAILURE A warning sign you can measure?YES: CONDITION-BASED Readings often enough to trend?YES: ADD PREDICTIVE Wear follows hours or time?YES: PREVENTIVE
Ask the questions in order for each important machine, or better, for each way it can fail.
  1. Does a failure matter? If it does not stop production, hurt anyone, damage quality or cost much to fix, run to failure is a fair choice. Keep a spare and move on.
  2. Is there a warning sign you can measure? Vibration, temperature, current, pressure, oil condition or a visual check. If yes, set a warning limit and use condition-based maintenance.
  3. Do readings arrive often enough to trend? If the sign develops over days or weeks and your readings come more often than that, project the trend ahead. That is predictive maintenance.
  4. If there is no sign, does wear follow hours, cycles or time? Seals, belts, filters and lubricant usually do. Use preventive maintenance by time or by usage. If none of the four fits, look at a design or operating change instead.

Which machine gets which: a table to copy

This is a starting point for common machines in Indian plants. Your duty, environment and history may push a machine into a different row, so change the last column to suit.

Starting strategy by machine and failure mode
Machine and failure modeWarning sign you can measureSuggested strategyYour choice (fill in)
Screw compressor: oil and filter wearNot reliablyPreventive by running hours
Screw compressor: air end bearingsVibration, discharge temperatureCondition-based, predictive if readings are frequent
Centrifugal pump: bearings and sealVibration, bearing temperature, leakageCondition-based on a weekly round
Hydraulic press: oil condition and pumpOil temperature, pressure, contaminationPreventive oil change plus condition checks
CNC machining centre: spindle bearingsVibration, spindle temperaturePredictive where a sensor exists, else condition-based
EOT crane: wire rope, brakes, limit switchesVisual wear, brake testPreventive inspection by time, statutory checks
Induction furnace: refractory liningWear readings, heats per campaignUsage-based with condition checks
Conveyor: belt and idlersVisual wear, noiseCondition-based on a walk-down round
Electronic cards, fuses, indicator lampsUsually noneRun to failure with spares on the shelf

Statutory inspections, such as those for lifting equipment and pressure vessels, stay on their fixed schedule whatever your strategy says.

Worked example: a forging plant in Rajkot

Worked example (illustrative)

Take a forging and machining plant in Rajkot with 120 assets. Every machine is on a monthly preventive schedule, set up when the plant first moved off paper. All numbers below are illustrative.

The maintenance head runs the four questions over the 18 machines that stop a line when they fail, and over a sample of the rest. Here is what comes out:

GroupCountBeforeAfter
Forging press main motors and gearboxes6Monthly PMWeekly vibration and temperature round, trended; PM only for lubrication
Screw compressors3Monthly PMPM every 2,000 running hours, plus a weekly discharge temperature reading
Cooling water pumps9Monthly PMCondition-based on the weekly round with warning limits
Other machines84Monthly PMKept on PM, interval reviewed against breakdown history
Small fans, lamps, controller cards18Monthly PMRun to failure, spares stocked

What the example shows (illustrative). The plant drops 18 monthly jobs that were adding no value and moves 9 pumps to a round that takes less time than the old PM. The six press drives get the most attention because a failure there stops the whole forge. When a gearbox reading starts rising at about 0.2 mm/s a week and the warning limit is 1.0 mm/s away, the trend says about five weeks. That is enough to order a bearing and fit it in the monthly shutdown instead of during a night shift.

Common mistakes

  • Buying sensors before choosing failure modes. A sensor on the wrong machine gives you a nice chart and no saved breakdowns. Pick the failures that matter first, then decide what to measure.
  • Setting limits nobody owns. A warning limit with no named person and no action is a number on a screen. Decide who gets the alert and what they do.
  • Trusting a trend built on bad readings. Different meters, different points on the casing and missed rounds make a trend jump around. Mark the measuring point and use the same instrument.
  • Dropping preventive work too early. Keep the old interval running until the condition readings have proved themselves over a few months.
  • Treating every machine the same. One strategy for the whole plant is easy to schedule and wrong for most machines.
  • Never reviewing the choice. After every breakdown, ask whether the strategy for that machine should change. The record of that decision is what makes the next one better.

Frequently asked questions

What is the difference between preventive and predictive maintenance?

Preventive maintenance is done on a fixed interval of time or usage. Predictive maintenance trends condition readings, such as vibration or temperature, to estimate when a part will reach its limit, and plans the work for that time.

Is condition-based maintenance the same as predictive maintenance?

They are close but not the same. Condition-based maintenance acts when a reading crosses a limit. Predictive maintenance uses the trend of the readings to forecast when the limit will be crossed, so the job can be planned earlier.

Do I need sensors for predictive maintenance?

Not always. A disciplined manual round with a handheld vibration meter or thermometer can be trended if readings are taken often enough, at the same point, with the same instrument. Sensors help when the warning time is short.

Which machines should stay on preventive maintenance?

Machines whose wear follows running hours, cycles or time, such as filters, belts, seals and lubricant, and anything with a statutory inspection. Also machines where no measurable warning sign exists.

When is run to failure acceptable?

When the failure does not stop production, does not create a safety or quality risk, is cheap to fix and a spare is on hand. Write the decision down so it is a choice, not an oversight.

Fix it before it fails.

Start a free trial today, or book a demo tailored to your plant, assets and standards.

Start with one line. Extend when it works.