VDA 6.3 vs IATF 16949: what is different and what maintenance must show for each
IATF 16949 is the quality management system standard your plant is certified to. VDA 6.3 is a process audit method that scores, question by question, whether a process actually works on the floor. For maintenance, IATF asks you to prove the system exists and runs, and VDA 6.3 asks you to prove it works on the specific machines that make the audited part. The same records can answer both, if they are tied to the machine.
The short version: a system standard and a process audit
If you supply the automotive industry from India, you probably meet both. Your IATF 16949 certificate is often the entry ticket to a customer's supplier list. Then a VDA 6.3 audit arrives, usually from a customer's supplier quality team, sometimes before a new part is awarded, sometimes after a quality problem. Many plants also use VDA 6.3 for their own internal process audits.
IATF 16949 was published by the International Automotive Task Force in 2016. It is used together with ISO 9001 and sets requirements for the whole quality management system. A certification body recognised under the IATF rules audits your site, and the result is a certificate or a list of nonconformities, graded major or minor. Surveillance audits follow through the certificate cycle.
VDA 6.3 is published by VDA QMC, the quality management centre of the German Association of the Automotive Industry. According to VDA QMC, the current edition was published in January 2023. It is a questionnaire for auditing a process. P1 is a potential analysis for new suppliers. A full process audit covers P2 to P7, from project management through development, supplier management and production to customer care. Each question is scored 10, 8, 6, 4 or 0, some questions are marked with a star, and the result is classified A, B or C.
The two meet in one place. IATF 16949 asks you to audit every manufacturing process over a three-year cycle and to use the customer's required approach for those audits. When your customer requires VDA 6.3, your internal process audits follow it too.
VDA 6.3 vs IATF 16949 side by side
Use this to explain the difference to a new maintenance engineer or a plant head who has only seen one of the two. It is a summary, not the text of either document. Read the licensed standard and the VDA volume for the exact wording.
| IATF 16949 | VDA 6.3 | |
|---|---|---|
| What it is | A quality management system standard | A process audit method with a fixed question set |
| Who audits you | A certification body recognised under the IATF rules | Usually your customer, or your own qualified internal auditors |
| What is judged | Whether the system meets each clause | Whether one process, for one product, works and is controlled |
| Result | Certificate, or major and minor nonconformities | A score per question and an A, B or C classification |
| Auditor qualification | Third-party IATF auditor | VDA 6.3 process auditor qualification for internal and external auditors |
| Where maintenance shows up most | Total productive maintenance, tooling, measurement resources | Production (P6), in the questions on material resources: equipment, tools, maintenance and test equipment |
| How the auditor works | Samples records across the system | Walks the process, station by station, and asks to see it working |
A plant can hold a clean IATF 16949 certificate and still score poorly in a VDA 6.3 audit. The certificate says the system exists. The process audit tests one process in depth.
What maintenance must show for each
Most of the evidence is the same. The difference is the question behind it. Copy this into your audit preparation sheet and fill the last column with where each record lives in your plant.
| Evidence | IATF 16949 asks | VDA 6.3 asks | Where it lives (fill in) |
|---|---|---|---|
| Equipment list with criticality | Have you identified the equipment needed to make conforming product? | Is the equipment for this process step capable and under control? | |
| PM plan and on-time completion | Is preventive maintenance planned, resourced and done? | Was PM done on this machine, and can you show the last closed jobs? | |
| Critical spares | Are replacement parts available for key equipment? | If this machine fails tonight, how long until it runs again? | |
| Maintenance objectives | Do you set objectives such as OEE, MTBF, MTTR or PM compliance, review them and act when missed? | Are failures on this process analysed and acted on? | |
| Breakdown to corrective action | Is there a documented action plan when an objective is missed? | Is the repeat failure closed with a cause and a check that the fix worked? | |
| Tooling and dies | Is there a tooling management system? | Are tools maintained, stored and released before use? | |
| Gauges and calibration | Are measuring resources calibrated and traceable? | Can the gauge at this station check this characteristic, and is it in date? |
If your MTBF and MTTR objectives come from a spreadsheet nobody can trace, rebuild them from logged breakdowns first. The MTBF and MTTR calculator shows the arithmetic.
Worked example: one press, two audits
Worked example (illustrative)
Take a sheet metal stamping supplier in Oragadam, near Chennai. It is IATF 16949 certified and makes brackets for a Tier 1 that supplies a German carmaker. The key machine is a 400 tonne mechanical press. All numbers and findings below are illustrative.
The IATF surveillance audit. The auditor samples maintenance objectives. The plant has set an MTBF objective of 120 hours for the press line. For two months in a row the line ran at about 96 hours. The monthly review minutes mention the miss, but there is no action plan with an owner and a date. The auditor raises a minor nonconformity against the requirement to act when objectives are not met. Everything else in maintenance is sampled and accepted.
The VDA 6.3 audit, three months later. The customer's auditor audits the bracket process and stands at the press. The maintenance-related part of the walk is scored like this:
| Topic at the press | What the auditor saw | Score (illustrative) |
|---|---|---|
| PM plan and completion | Plan in place, last six PMs closed on time with readings | 8 |
| Die maintenance | Die cleaned after every run, but no stroke count to trigger regrinding | 6 |
| Critical spares | Clutch and brake spares not named, lead time unknown | 4 |
| Repeat breakdown | Same hydraulic overload trip on three work orders, no root cause recorded | 4 |
| Gauge at the station | Height gauge in date, certificate traceable | 10 |
| Total for this slice | 32 of 50 possible points | 64% |
What the example shows (illustrative). The same press passed the IATF audit with one minor finding, then lost most of its points in VDA 6.3 on two topics: spares and a repeat failure. Neither was hidden. They were simply not tied to the machine. A real VDA 6.3 result is calculated across all questions and elements, with special rules for starred questions, so do not read this slice as a rating. The fixes are small: name the clutch and brake spares with stock and lead time, run a root cause on the overload trip and link it to the three work orders, and add a stroke count trigger for the die.
One set of records for both audits
- Start from the customer's parts. List the machines that make the parts in the scope of your next VDA 6.3 audit. Mark them by criticality.
- Open each machine and time yourself. Try to show the PM plan, the last three closed PMs, the critical spares, the last breakdown and the gauges used at that station. Anything that takes more than a few minutes is a gap.
- Close the loop on repeat failures. For every breakdown that happened twice, write the cause and the action on the work order, and check whether it came back.
- Write the action where the objective lives. When an MTBF, MTTR or PM compliance objective is missed, record the action, owner and date next to it. This is what the IATF auditor samples.
- Run an internal VDA 6.3 walk. Use a qualified internal auditor and the current question set on one process. Score it honestly, then fix the lowest scores first. The VDA 6.3 maintenance audit checklist helps you prepare.
You do not need two systems. You need one record per machine that a quality engineer and an auditor can both open. Use this order to get there:
Common mistakes
- Treating the IATF certificate as proof for VDA 6.3. The certificate says your system exists. A VDA 6.3 auditor wants to see this machine, this die and this gauge working today.
- Preparing documents instead of the floor. A VDA 6.3 auditor walks the process. A neat procedure in the quality office does not help if the operator cannot show the PM record at the press.
- Objectives with no action. Setting MTBF or OEE targets and then not acting when they are missed is one of the easiest findings to avoid.
- Repairs logged without a cause. Three work orders for the same trip, each closed as "reset and run", tell the auditor that failures are not analysed.
- Forgetting tools and dies. Maintenance often owns the press but not the die. In a stamping or casting plant, die records are part of the same question.
- Using an old question set. VDA QMC published the current VDA 6.3 edition in January 2023. Internal audits based on an older checklist may miss questions your customer will ask.
Sources
- VDA 6.3 FAQ (opens in a new tab), VDA QMC (Quality Management Center of the German Association of the Automotive Industry)
- IATF global oversight (opens in a new tab), International Automotive Task Force
- About IATF (opens in a new tab), International Automotive Task Force
Frequently asked questions
What is the difference between VDA 6.3 and IATF 16949?
IATF 16949 is a quality management system standard that your site is certified to by a certification body. VDA 6.3 is a process audit method, often used by customers, that scores whether a specific process works on the floor.
Do I need VDA 6.3 if I am IATF 16949 certified?
Often, yes. Many customers ask for VDA 6.3 audits of their suppliers, and IATF 16949 asks you to use the customer's required approach for your own manufacturing process audits.
How is a VDA 6.3 audit scored?
Each question is scored 10, 8, 6, 4 or 0. Some questions are marked with a star. The results are combined and the process is classified A, B or C, using the rules in the current VDA 6.3 volume.
Where does maintenance appear in VDA 6.3?
Mostly in the production element, P6, in the questions on material resources such as equipment, tools, maintenance and test equipment. Failure analysis and corrective action also come up across the audit.
Which IATF 16949 clause covers maintenance?
The main one is the total productive maintenance requirement, often cited as clause 8.5.1.5 of IATF 16949:2016. Tooling management and measurement resources also apply to maintenance work.
Keep reading
Compliance evidence packs
VDA 6.3 and IATF 16949 packs with clause labels, a gaps summary and a readiness score.
ReadVDA 6.3 maintenance audit checklist
What to have ready before a process audit, organised the way an auditor thinks.
ReadIATF 16949 maintenance evidence
The maintenance records an IATF auditor typically asks to see.
Read